This week our Cub Scout Pack will have it's Pinewood Derby, and two of my Webelos Scouts will be crossing over to Boy Scouting. My den has both 4th graders, and 5th graders, and the two fifth graders have completed what they needed to for crossing over. To honor their accomplishments, I'm making what I call arrow plaques for them. Basically I take a 1x4 ceder board, about 3 feet long... wood burn their name and the year onto the board. On to this will be mounted an arrow which has had a color band painted for every rank award they have earned during their Cub Scout career. Bobcat is blue, Wolf is red, Bear is a sea-green, Arrow Points are gold and silver. Webelos rank is a tan color, and Arrow of Light is yellow. Then they also get a band for each activity pin they earned as a Webelos, which are color coded to the activity badge group the pin belongs to. (red, purple orange, blue, and green.) Both of these boys earned 8 activity pins. So all the paint except silver has been done (I might need to buy some silver), and I'm now waiting for the paint to get dry enough to remove the tape before I go to bed.
So tomorrow, I will do the woodburning (the letters and numbers are already traced onto the boards, then I will attach the arrow mounting bracket, and stain the wood. I'll mount the arrows Wednesday just in time for the pack meeting. As well as a quick trip to Flagstaff to pick up the Pinewood Derby trophies for the race. I'll take a picture of the plaques when they are done, so you can see them. But now time to remove the tape, and then off to bed. Tomorrow will be a busy day.
Tuesday, March 23, 2010
Sunday, March 14, 2010
Getting Ready for Spring
Last night we received just a dusting of new snow, but yesterday I started getting serious about Spring. As I've mentioned before, hubby and I will be planting our first vegetable garden this spring. We ordered a bunch of different seeds, and some of them are to be started indoors before the weather is nice enough to go outside. Specifically, the tomatoes and the cabbage need to be started 4-8 weeks early. We purchased a planter box with a cover to start our seeds. Here is a pictures of the first seeds we have planted.

Last fall I purchased tulip and daffodil bulbs, and planted a lot of them. But I don't know what I was thinking when I purchases the bag of 90+ tulip bulbs. I did not get them all planted, and noticed they were starting to sprout all on their own. So I planted them in what ever containers I could find. I don't know if they will flower, but I'm hoping I can put them outside when the ground thaws, and if I don't have flowers this spring, maybe I will next spring?? Below is a close up of all the bulbs.

Next I want to show you my table runner I have been working on. I picked the option that most of you also liked, but I shortened it. So here is the pieced top:

And below is a close up view of one of the ends of the runner. I'm not sure what I did, if I stretched the bias, or I'm thinking it was when I sewed the bias background to the strip sets. Anyway, I had a dickens of a time getting all the seams in the strip sets to match. The person leading the group that this is from was raving how easy this pattern was. Well, I didn't find it that easy, and I'm not sure that I will make it again. If I do, I will probably pick a different setting for the blocks - one where I won't have to match all the seams!!

Last fall I purchased tulip and daffodil bulbs, and planted a lot of them. But I don't know what I was thinking when I purchases the bag of 90+ tulip bulbs. I did not get them all planted, and noticed they were starting to sprout all on their own. So I planted them in what ever containers I could find. I don't know if they will flower, but I'm hoping I can put them outside when the ground thaws, and if I don't have flowers this spring, maybe I will next spring?? Below is a close up of all the bulbs.

Next I want to show you my table runner I have been working on. I picked the option that most of you also liked, but I shortened it. So here is the pieced top:

And below is a close up view of one of the ends of the runner. I'm not sure what I did, if I stretched the bias, or I'm thinking it was when I sewed the bias background to the strip sets. Anyway, I had a dickens of a time getting all the seams in the strip sets to match. The person leading the group that this is from was raving how easy this pattern was. Well, I didn't find it that easy, and I'm not sure that I will make it again. If I do, I will probably pick a different setting for the blocks - one where I won't have to match all the seams!!
Friday, March 12, 2010
More on Robotics
The matches are today and tomorrow!
One of the teams is streaming the matches:
http://www.team987.com/webcasts/
Current Standings:
http://www2.usfirst.org/2010comp/events/AZ/rankings.html
Match Results:
http://www2.usfirst.org/2010comp/events/AZ/matchresults.html
My son's team is 1165, Team Paradise
One of the teams is streaming the matches:
http://www.team987.com/webcasts/
Current Standings:
http://www2.usfirst.org/2010comp/events/AZ/rankings.html
Match Results:
http://www2.usfirst.org/2010comp/events/AZ/matchresults.html
My son's team is 1165, Team Paradise
Thursday, March 11, 2010
Sewing Day and Robotics...
Yesterday, I was to have a sewing day. But we didn't allow enough time for travel when we left the house, so there was not really time to drop me off before hubby went to his first meeting. One thing led to another, and I did not get to the travel trailer until about 3:30pm. At that time my in-laws were already there, so I got to visit with them for a while, and then we went to dinner. So my sewing day started about 7pm. I'll show you the results of the sewing, but first I want to show you a little about Robotics...
My youngest son is in his first year teaching at a High School in Phoenix, AZ. He is also assisting with the Robotics Team at the school. He is working with another teacher who has a lot of experience working with the Robotics team. The first two pictures show the playing field for the district competition in Phoenix this weekend. The robots they are building will play soccer. Notice the red "bump" in the first picture, and the blue "bump" in the second picture. One of the requirements is that the robot be able to move over these bumps!! In the first picture you can also see one of the goals. It is the box below the bulls-eye target. (The bulls-eye may also be part of the goal, I didn't get any information on exactly how they are to play the game, and no one was practicing when we were in this area.

My youngest son is in his first year teaching at a High School in Phoenix, AZ. He is also assisting with the Robotics Team at the school. He is working with another teacher who has a lot of experience working with the Robotics team. The first two pictures show the playing field for the district competition in Phoenix this weekend. The robots they are building will play soccer. Notice the red "bump" in the first picture, and the blue "bump" in the second picture. One of the requirements is that the robot be able to move over these bumps!! In the first picture you can also see one of the goals. It is the box below the bulls-eye target. (The bulls-eye may also be part of the goal, I didn't get any information on exactly how they are to play the game, and no one was practicing when we were in this area.

This is the team's robot. There are very serious safety inspections, and most teams need to do some work between their first inspection, and their final inspection. There are also size and weight restrictions.

My son is in the lower right corner of the above picture. They are fastening on the red bumpers after their first inspection.

I was just amazed by what the High School Students build.
One of the items they needed to fix was the camera was "grounding out on the frame". Here they are drilling a hole in the mount, and will add some type on insulation before re-fastening it to the robot. (and yes, that is a girl doing the drilling. There were almost as many girls there, as there were guys!)

My son is in the lower right corner of the above picture. They are fastening on the red bumpers after their first inspection.

I was just amazed by what the High School Students build.
One of the items they needed to fix was the camera was "grounding out on the frame". Here they are drilling a hole in the mount, and will add some type on insulation before re-fastening it to the robot. (and yes, that is a girl doing the drilling. There were almost as many girls there, as there were guys!)Unfortunately, we had to leave, as we had to be home early evening to meet with our Cub Scout Dens, so we did not get to see their robot in action. Here is wishing them well in the competition tomorrow!!!
Now the sewing I did get done yesterday evening was to finish the wedding ring "sausages" that will be part of my tablerunner. I started this with my neighborhood group. We are piecing arcs, and then sewing them to iron-on interfacing, and then turning them right side out. Below I have laid them out on the fabric I plan to use for the background. This is not what I had pictured. I was planning to make the cornerstones (missing in these pictures) either dark blue or dark brown. But I wanted the blue at the brown ends of the arcs, and the brown at the blue ends. As you can see, I have brown and blue coming together at each end. Hmm. I'm thinking that I might make some more arcs, and flip the blue and brown "ends" And I think I might scramble the fabrics in their positions, still alternating the blue and the brown, but moving the fabrics around. What do you think? The white ends are the interfacing, and the dark blue and brown fabrics will get sewn over these ends.

Below is a close up of the end. You can see the interfacing at the ends of the arcs, and I have the brown and blue fabrics in the lower corners.

The other projects I took with me, but did not have time to do, were the table runner I showed you a few days ago, and the next block of the month kit from Odegaards. No worries about running out of projects to do. LOL!!
Now the sewing I did get done yesterday evening was to finish the wedding ring "sausages" that will be part of my tablerunner. I started this with my neighborhood group. We are piecing arcs, and then sewing them to iron-on interfacing, and then turning them right side out. Below I have laid them out on the fabric I plan to use for the background. This is not what I had pictured. I was planning to make the cornerstones (missing in these pictures) either dark blue or dark brown. But I wanted the blue at the brown ends of the arcs, and the brown at the blue ends. As you can see, I have brown and blue coming together at each end. Hmm. I'm thinking that I might make some more arcs, and flip the blue and brown "ends" And I think I might scramble the fabrics in their positions, still alternating the blue and the brown, but moving the fabrics around. What do you think? The white ends are the interfacing, and the dark blue and brown fabrics will get sewn over these ends.

Below is a close up of the end. You can see the interfacing at the ends of the arcs, and I have the brown and blue fabrics in the lower corners.

The other projects I took with me, but did not have time to do, were the table runner I showed you a few days ago, and the next block of the month kit from Odegaards. No worries about running out of projects to do. LOL!!
I hope to do a little more sewing tomorrow. Also, I'm going with a couple other quilters from my neighborhood to see the local quilt show at the Flagstaff Library. Should be a fun time! Maybe they will let me take pictures to share with you.
Tuesday, March 9, 2010
Snow, Snow, go away; Come back another day!
Actually I like the snow. Even after shoveling for over an hour. It snowed yesterday, and was supposed to be done last night. But it snowed more today that it did yesterday. We have accumulated another 8-12 inches, I think. I have a hard time telling with the drifts, and we had a lot of wind with this storm. (Hmmm, must be that I'm getting a little tired of the snow, because I didn't even bother to take pictures.) All the ground that was starting to show is now under a good layer of snow. Lets just all pray that it melts slowly, or we will probably have flooding in our little town.
I'm going to have a sewing day tomorrow, and I'm looking forward to it. (Today I helped hubby with his stuff, and worked on his new web site.) I'll show you what I accomplish when I get back to my computer.
I'm going to have a sewing day tomorrow, and I'm looking forward to it. (Today I helped hubby with his stuff, and worked on his new web site.) I'll show you what I accomplish when I get back to my computer.
Saturday, March 6, 2010
Your opinion wanted please!
I have the blocks together for my table runner, and now the fun begins. Below are different settings for the blocks. All pictures have the same blocks, just twisted and turned. So which setting(s) do you like? And to add more options, I have one strip set left that will make 4 more triangles. These could be put on the ends, and make the ends of the runner pointed instead of square. This last strip set has the bright orange fabric in it, in the 2nd or 4th positions (2 each).
Disclaimers: 1. Now that I see what the strips are doing, I wish I had arranged the strips differently. 2. Yes, the right side of the runner is "floating". My table was not long enough to hold all the blocks - no the runner will not necessarily be on this table. and 3. Please ignore the toes that appear in some of the pictures!!

The pic above and the next two below are the same settings just playing with moving the blocks around.



Again, above and below are the same, just rotating the "squares" on the ends.

Please, I really do want your comments. Even if you are not a quilter, you can decide which one(s) you like best. Please drop me a line and let me know. (Click on the " comments" like just below, between the envelope and the pencil)
Disclaimers: 1. Now that I see what the strips are doing, I wish I had arranged the strips differently. 2. Yes, the right side of the runner is "floating". My table was not long enough to hold all the blocks - no the runner will not necessarily be on this table. and 3. Please ignore the toes that appear in some of the pictures!!

The pic above and the next two below are the same settings just playing with moving the blocks around.


Again, above and below are the same, just rotating the "squares" on the ends.

Please, I really do want your comments. Even if you are not a quilter, you can decide which one(s) you like best. Please drop me a line and let me know. (Click on the " comments" like just below, between the envelope and the pencil)
Thanks so much!
The first blocks...
I just couldn't wait until tomorrow to see the first of the blocks from the strip sets. If you look at the post below, this is the far right strip set, cut into blocks. To make these, you cut a 45 degree strip of background the same width as the strip set, layer the strip set and the background, and then sew down both sides. Then use the "Diagonal Set Triangle Ruler to cut 7 inch blocks from the sewn strip. I needed to pick out a few stitches at the point of each block before I could open them and press them. I'm not sure I will put these 4 blocks together like this. I'll have to see what the other two strip sets make. Yes, I have 4 strip sets. The fourth one will make points at the end of the table runner.

I'll post more progress tomorrow.

I'll post more progress tomorrow.
Subscribe to:
Posts (Atom)


